China Premium Plastic Drainage Catch Basin Mould
China Premium Plastic Drainage Catch Basin Mould
Description
Basic Info.
Model NO. | JSL-T2020327-17 |
Runner | Hot/Cold Runner |
Design Software | Ug, PRO-E, Solidwork |
Installation | Fixed |
Certification | ISO |
Standard | Dme/Lkm/Hasco Ect |
Customized | Customized |
Design | 7days |
Mould 1st Text | 80days |
Heat Treatment | Nitriding |
Sample | Avaliable |
Aftersale | 1 Year |
Mould Report | 7-10days/Time |
Mould Quality Control | Professional QC in House Machine |
Engineer Teams | 22 Years Experience |
Machine Equipment | CNC, EDM, Wire Cutting Machine, Drilling/Grinding/Car |
Mould Operating Mode | Automatically by CNC |
Mould Base | S50c/C45 |
Transport Package | Wooden Crate |
Trademark | JSLMOULD |
Origin | Taizhou, China |
HS Code | 8480719090 |
Production Capacity | 500 Sets Molds/Year |
Product Description
Product Name | China Premium Plastic Drainage Catch Basin Mould |
Product material | HDPE |
Core&Cavity Steel | P20,H13,718,2738 |
Steel hardness: | HRC34-38 |
Mould Standard | DME,HASCO,LKM etc |
Cavity Number | single |
Injection System | direct gate |
Ejector System | ejector pin/ejector plate |
mould base | S50C/c45 |
Cycle Time | 100-200S |
Tooling lead time | 60DAYS |
Mould life5 | 500,000SHOTS |
Quality assurance | ISO9001 |
Specification | According to client's requirements |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. |
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. |
Our Contact
Send now